Make your Circular Economy Statement easier to write and easier to prove. Camio provides the audits, data and reporting it relies on, at every stage of the scheme.

What circular economy statement support is.

GLA-referable schemes in London must submit a Circular Economy Statement under London Plan Policy SI 7. It sets out how the design keeps materials in use, how demolition and construction waste will be managed, and how the targets will be met.

The statement draws on a pre-redevelopment audit and a pre-demolition audit, and is updated as the scheme moves through planning and construction.

  • Audit evidence for retention, reuse and recycling decisions
  • Data to report against the targets at each stage

Why it matters.

The GLA asks for Circular Economy Statement information at several stages, including the post-completion report. Targets include diverting 95% of construction and demolition waste from landfill, and the evidence has to hold up.

Most of the effort is in the data. When audits and tracking sit in separate spreadsheets, updating the statement at each stage becomes a project in itself.

The Camio difference

Camio Circular Economy Statement support.

Camio keeps the audits, decisions and outcomes for your scheme in one live inventory. Reports for each stage are generated from that inventory in minutes, so your statement stays in step with what is really happening on site.

Because Camio tracks items after they leave site, your post-completion reporting can show where materials actually went, not just where they were planned to go.

How it works

From site visit to finished report, in days not weeks.

  1. 01

    Audit

    Pre-redevelopment and pre-demolition audits captured in the Camio app.

  2. 02

    Set targets

    Reuse, recycling and diversion targets set from real inventory data.

  3. 03

    Track delivery

    Items and waste streams tracked as they leave site.

  4. 04

    Report each stage

    Data for each stage of the statement generated in minutes.

  5. 05

    Post-completion

    Actual outcomes reported from tracked destinations.

What's included in a Camio CES.

Deliverables

  • Audit evidence

    The audits your statement relies on, in one inventory.

  • Target data

    Quantities and routes to set and test your targets.

  • Stage reporting

    Data for each submission, generated from live records.

  • Post-completion evidence

    Where materials actually went, item by item.

Compliance

  • London Plan Policy SI 7 (circular economy)
  • GLA Circular Economy Statement guidance
  • 95% construction and demolition waste diversion target
  • BREEAM Wst 01

Ideal for

  • Developers of GLA-referable schemes
  • Planning and sustainability consultants
  • Main contractors responsible for delivery reporting
  • Schemes with existing buildings on site

Every asset, every life

Most audits describe a building on one day. Camio follows every asset for life.

Each item keeps its record through every life, every location and every owner. That is what makes Camio the natural fit for BREEAM In-Use, SKA and estates where assets move between projects again and again.

Asset record · Glass display counter

One item, followed across four stages

186 kgCO₂e kept in use across three lives
  1. Life 1

    Retail unit, Building A

    Owner: Tenant A

    2019 to 2026

  2. Audit

    Pre-refurbishment audit

    Captured, tagged, carbon calculated

    Oct 2026

  3. Life 2

    Floor 3, Building B

    Owner: Landlord

    2026 to 2029

  4. Life 3

    Resold to a new owner

    Via the Camio marketplace

    2029 onwards

Multiple lives

Reuse, refurbishment and resale are recorded against the same item, so carbon savings add up over every life.

Multiple locations

Moves between floors, buildings and projects are tracked, so the inventory always shows where things really are.

Multiple owners

Items keep their history when they change hands, from landlord to tenant to buyer, across your whole estate.

Audit enquiry

Tell us about your project.

We will come back with a scope and a fee proposal.

It helps to include

  • The site address and approximate floor area (GIA)
  • The audit you need, or the planning, BREEAM, GLA or SKA requirement it is for
  • Your programme: when you need the report and when strip-out or demolition starts
  • Drawings, asbestos surveys or previous audits, if you have them

[We aim to reply within X hours and can be on site within X days.]

FAQ

Questions we are often asked

Do you write the Circular Economy Statement?

[Confirm: whether Camio writes the statement or provides the audits and data to the planning consultant who does.]

Which audits does a Circular Economy Statement need?

Usually a pre-redevelopment audit where buildings could be retained, and a pre-demolition audit before anything is demolished. Your planning consultant will confirm what your scheme needs.

How does Camio help at post-completion?

Camio tracks items and materials after they leave site, so the post-completion report can show actual outcomes rather than planned ones.