Audit the building. Keep what is inside in use.
Every type of building audit, from pre-redevelopment to BREEAM In-Use, built for BREEAM, GLA and SKA requirements. Two days on site, a live inventory of every item and material, and as many versions of the report as you need, generated in minutes.
- Minutes
- from site visit to finished report
- 2 days
- on site for four buildings at 55 Broadway
- Item-level
- weight, materials and embodied carbon
Image: Camio auditor in hi-vis photographing a stripped-back office floor (hero photo from Figma)
Trusted on site and across estates by
Our audits
Every audit you need, on one platform.
From planning to strip-out to buildings in use. Each audit feeds the same live inventory, so data from one stage carries straight into the next.
Pre-redevelopment audit
Tests whether existing buildings can be retained or adapted before you commit to demolition, with the evidence planners expect.
Learn more
PDAPre-demolition audit
Everything on site catalogued before demolition, with weight, embodied carbon and a reuse or recycling route for every material.
Learn more
PRAPre-refurbishment audit
A survey before strip-out, with a retain, reuse, resale or recycling decision for each item due for removal.
Learn more
MRAMaterial reclamation audit
A fast, focused survey of the high-value items most likely to be reused, with a plan to keep them out of landfill.
Learn more
FF&EFurniture and FF&E carbon audit
Every chair, desk and storage unit counted, located and given a carbon value, across one building or a whole estate.
Learn more
BIUBREEAM In-Use resources inventory
An inventory of a building's key materials with value, upkeep and reuse strategies, kept current as the building changes.
Learn more
SKASKA fit-out audit
Evidence for RICS SKA rating on office, retail and higher education fit-outs, from design through to occupancy.
Learn more
Not sure which audit you need?
Tell us about the building and your planning, BREEAM or SKA requirement, and we will recommend the right audit.
Start an enquiry →
Services built on your audit
Material passports
A digital record for every item and material that follows it through every life, location and owner.
Learn more
CESCircular Economy Statement support
The audits, data and reporting behind your GLA Circular Economy Statement, from pre-application to post-completion.
Learn more
SWMPSite waste management plan
A plan for the waste your project will produce, built from real audit data and tracked as the work happens.
Learn more
Every asset, every life
Most audits describe a building on one day. Camio follows every asset for life.
Each item keeps its record through every life, every location and every owner. That is what makes Camio the natural fit for BREEAM In-Use, SKA and estates where assets move between projects again and again.
Asset record · Glass display counter
One item, followed across four stages
- Life 1
Retail unit, Building A
Owner: Tenant A
2019 to 2026
- Audit
Pre-refurbishment audit
Captured, tagged, carbon calculated
Oct 2026
- Life 2
Floor 3, Building B
Owner: Landlord
2026 to 2029
- Life 3
Resold to a new owner
Via the Camio marketplace
2029 onwards
Multiple lives
Reuse, refurbishment and resale are recorded against the same item, so carbon savings add up over every life.
Multiple locations
Moves between floors, buildings and projects are tracked, so the inventory always shows where things really are.
Multiple owners
Items keep their history when they change hands, from landlord to tenant to buyer, across your whole estate.
Why Camio
A living inventory, not a static PDF.
Traditional audits end at the report. Ours keep working through the project and beyond.
| Compared | Traditional audit | Camio audit |
|---|---|---|
| Report turnaround | A week or more | Minutes after the site visit |
| What you are left with | A PDF, out of date by handover | A live inventory with item-level records |
| Follow-on reports | Re-commissioned and re-paid | Re-run any time, no extra cost |
| Carbon and materials | Estimated in bulk | Calculated per item, checked by auditors |
| Reuse | A list of suggestions | Named recovery partners and tracked destinations |
| Asset history | Ends at the report | Follows every item across lives, locations and owners |
Image: McAleer & Rushe report cover
Free download
See a real pre-demolition audit report.
The McAleer & Rushe report for 55 Broadway: materials by weight and embodied carbon, EWC codes and a recovery partner for every material stream.
We will email you a link straight away. We will never share your details.
Audit enquiry
Tell us about your project.
We will come back with a scope and a fee proposal.
It helps to include
- The site address and approximate floor area (GIA)
- The audit you need, or the planning, BREEAM, GLA or SKA requirement it is for
- Your programme: when you need the report and when strip-out or demolition starts
- Drawings, asbestos surveys or previous audits, if you have them
[We aim to reply within X hours and can be on site within X days.]
Audit to action
Every audit is a live inventory.
The report is the start, not the end. Plan what stays, what moves and what sells, then report on it any time, all from the same inventory.
- 1
Gather
Auditors capture every item on site with the Camio app. AI identifies it and records size, weight, materials and carbon.
- 2
Plan
Your team reviews the inventory together, tags and groups items, and decides what to retain, reuse, resell or recycle.
- 3
Action
Book moves to other sites, share items with partners or list them on the Camio marketplace, all tracked.
- 4
Report
Re-run reports any time. Carbon, waste and value update as items leave site, so your numbers stay current.
Questions we are often asked
Which audit do I need?
It depends on the stage of the project. A pre-redevelopment audit tests whether to keep the building, a pre-demolition audit catalogues what comes out, and a pre-refurbishment audit covers strip-outs where the structure stays. If you are not sure, send us an enquiry and we will recommend the right one.
How quickly can Camio complete an audit?
Site time depends on the building. At 55 Broadway, four buildings took two days. Reports are generated from the inventory in minutes, and you can re-run them whenever you need an updated version. [Add booking lead time.]
What is a GLA Circular Economy Statement?
GLA-referable schemes in London must submit a Circular Economy Statement under London Plan Policy SI 7, showing how materials from demolition will be reused or recycled. A pre-demolition audit provides the inventory and reuse routes it depends on.
Can Camio support BREEAM In-Use and SKA?
Yes. Both reward knowing what is in a building and what happens to it over time. Because Camio tracks every asset across its lives, locations and owners, your resources inventory and fit-out evidence stay current instead of going out of date after the audit.
What happens to the materials after the audit?
They stay in your Camio inventory. Your team decides what to keep, move to another site, share with partners or list on the Camio marketplace, and every destination is tracked.
Do you audit outside London?
[Confirm UK coverage and how audits are staffed outside London.]