SWMP

Site waste management plans.

Plan your project waste from real data, not estimates. Camio builds your site waste management plan from the audit inventory and tracks each stream as it leaves site.

What site waste management plan is.

A site waste management plan sets out the types and quantities of waste a project will produce and how each will be reused, recycled or disposed of. It is updated as the work progresses and closed out at the end with actual figures.

The best plans start from a pre-demolition audit or pre-refurbishment audit, so quantities are measured rather than guessed.

  • Waste streams and quantities from audit data
  • A reuse or recycling route for each stream

Why it matters.

SWMPs are no longer a legal requirement in England, but they are still expected by BREEAM (as a resource management plan under Wst 01), by many planning conditions and by clients with diversion targets.

A plan is only as good as its data. Tracking actual waste against the plan is what turns it from a document into evidence.

The Camio difference

Camio site waste management plans.

Camio builds the plan from the audit inventory, so each waste stream has measured quantities and a named route from day one.

As items and materials leave site, their destinations are recorded in Camio, so updating and closing out the plan is a report rather than a chase for paperwork.

How it works

From site visit to finished report, in days not weeks.

  1. 01

    Audit

    Quantities and materials captured in a Camio audit.

  2. 02

    Plan

    Waste streams, targets and routes set from the inventory.

  3. 03

    Track

    Items and materials recorded as they leave site.

  4. 04

    Update

    The plan is refreshed from live data as works progress.

  5. 05

    Close out

    Actual figures reported against the plan at completion.

What's included in a Camio SWMP.

Deliverables

  • Waste forecast

    Types and quantities of waste, measured from the audit.

  • Routes and targets

    A reuse, recycling or disposal route for each stream.

  • Live tracking

    Actual destinations recorded as materials leave site.

  • Close-out report

    Planned against actual, ready for BREEAM and your client.

Compliance

  • BREEAM Wst 01 resource management plan
  • Planning conditions requiring a waste plan
  • Data in European Waste Codes
  • Duty of care records for waste leaving site

Ideal for

  • Main contractors and demolition contractors
  • Projects targeting BREEAM ratings
  • Clients with landfill diversion targets
  • Schemes with waste planning conditions

Every asset, every life

Most audits describe a building on one day. Camio follows every asset for life.

Each item keeps its record through every life, every location and every owner. That is what makes Camio the natural fit for BREEAM In-Use, SKA and estates where assets move between projects again and again.

Asset record · Glass display counter

One item, followed across four stages

186 kgCO₂e kept in use across three lives
  1. Life 1

    Retail unit, Building A

    Owner: Tenant A

    2019 to 2026

  2. Audit

    Pre-refurbishment audit

    Captured, tagged, carbon calculated

    Oct 2026

  3. Life 2

    Floor 3, Building B

    Owner: Landlord

    2026 to 2029

  4. Life 3

    Resold to a new owner

    Via the Camio marketplace

    2029 onwards

Multiple lives

Reuse, refurbishment and resale are recorded against the same item, so carbon savings add up over every life.

Multiple locations

Moves between floors, buildings and projects are tracked, so the inventory always shows where things really are.

Multiple owners

Items keep their history when they change hands, from landlord to tenant to buyer, across your whole estate.

Audit enquiry

Tell us about your project.

We will come back with a scope and a fee proposal.

It helps to include

  • The site address and approximate floor area (GIA)
  • The audit you need, or the planning, BREEAM, GLA or SKA requirement it is for
  • Your programme: when you need the report and when strip-out or demolition starts
  • Drawings, asbestos surveys or previous audits, if you have them

[We aim to reply within X hours and can be on site within X days.]

FAQ

Questions we are often asked

Are site waste management plans still required?

They are no longer a legal requirement in England, but BREEAM, many planning conditions and many clients still ask for one.

Can you build the plan from an existing audit?

Yes. If you already have a Camio audit, the plan is built from that inventory.

How do you track actual waste?

Destinations are recorded in Camio as items and materials leave site, so the plan can be updated and closed out from live data.