Skip to main content
PRA

Pre-refurbishment audits.

Decide what stays before the strip-out starts. A pre-refurbishment audit gives you an evidenced retain, reuse or replace decision for every item, and a live inventory to act on it.

What is a pre-refurbishment audit?

A pre-refurbishment audit surveys a building before refurbishment, where the structure is staying. It covers the fit-out, finishes, services and FF&E, and works out space by space what can stay in place, what can be reused elsewhere and what genuinely needs to go.

Unlike a pre-demolition audit, the starting point is retention, not removal. Where demolition is still an option, a pre-redevelopment audit comes first.

  • Every item photographed, measured and assessed for condition
  • A recorded decision for each item, not a judgement call

Why you need a pre-refurbishment audit.

Retrofit First policies, including in Westminster, and the London Plan expect you to show that retaining and reusing what is there was properly considered before anything was replaced. Planners want evidence, not intentions.

Every item kept in place or reused avoids embodied carbon that new products can never claw back, and every item resold offsets the cost of the works.

The Camio difference

Camio pre-refurbishment audits.

We capture the fit-out room by room in the Camio app, with AI identifying each item and our auditors checking condition, materials and carbon. Your design team and contractor review the inventory together online and record each decision against the item.

Items that cannot stay but still have value can be moved to another of your sites, shared with partners or listed on the Camio marketplace, and they keep their history wherever they go.

How it works

From site visit to finished report, in days not weeks.

  1. 01

    Capture on site

    Fit-out, finishes and FF&E catalogued room by room in the Camio app, with photos and condition.

  2. 02

    Carbon and waste data

    Embodied carbon and European Waste Codes calculated for every item, checked by our auditors.

  3. 03

    Decide together

    Your team marks each item to retain, reuse, resell or replace in the shared inventory.

  4. 04

    Report in minutes

    An asset register with schedule, quantities, condition and value, generated from the inventory.

  5. 05

    Action and track

    Book moves, list items for resale and track each one to its next home.

What's included in a Camio PRA.

Deliverables

  • Retain, reuse or replace

    A clear decision for every audited item, space by space.

  • Embodied carbon evidence

    Carbon data to support and defend your retention decisions.

  • Planning and BREEAM-ready report

    Evidence formatted for planning, BREEAM and your Circular Economy Statement.

  • Route to reuse

    Surplus listed for reuse or resale instead of going to skip.

Compliance

  • BREEAM Wst 01 construction waste credits
  • GLA Circular Economy Statement guidance
  • London Plan Policy SI 7 (circular economy)
  • Retrofit First policies, including Westminster
  • Data in European Waste Codes

Ideal for

  • Office and commercial refurbishments
  • Cat A and Cat B strip-outs
  • Retail, hotel and leisure refits
  • Landlords and occupiers with rolling refurbishment programmes

Every asset, every life

Most audits describe a building on one day. Camio follows every asset for life.

Each item keeps its record through every life, every location and every owner. That is what makes Camio the natural fit for BREEAM In-Use, SKA and estates where assets move between projects again and again.

Asset record · Glass display counter

One item, followed across four stages

186 kgCO₂e kept in use across three lives
  1. Life 1

    Retail unit, Building A

    Owner: Tenant A

    2019 to 2026

  2. Audit

    Pre-refurbishment audit

    Captured, tagged, carbon calculated

    Oct 2026

  3. Life 2

    Floor 3, Building B

    Owner: Landlord

    2026 to 2029

  4. Life 3

    Resold to a new owner

    Via the Camio marketplace

    2029 onwards

Multiple lives

Reuse, refurbishment and resale are recorded against the same item, so carbon savings add up over every life.

Multiple locations

Moves between floors, buildings and projects are tracked, so the inventory always shows where things really are.

Multiple owners

Items keep their history when they change hands, from landlord to tenant to buyer, across your whole estate.

Audit enquiry

Tell us about your project.

We will come back with a scope and a fee proposal.

It helps to include

  • The site address and approximate floor area (GIA)
  • The audit you need, or the planning, BREEAM, GLA or SKA requirement it is for
  • Your programme: when you need the report and when strip-out or demolition starts
  • Drawings, asbestos surveys or previous audits, if you have them

[We aim to reply within X hours and can be on site within X days.]

FAQ

Questions we are often asked

What is the difference between a pre-refurbishment and a pre-demolition audit?

A pre-refurbishment audit happens before a strip-out where the structure is retained, and focuses on fit-out, finishes, services and FF&E. A pre-demolition audit happens before a building is fully or partly demolished and covers the structure and fabric as well.

How quickly can you complete one?

Most floors can be captured in a day or less, and the report is generated in minutes after the site visit, so it fits around your strip-out programme. [Add booking lead time.]

What do you need from us?

Access to the building and, if you have them, floor plans, an existing asset or FF&E list and your programme. We capture everything else on site.