Pre-redevelopment audits.

Find out what can stay before anything comes down. A pre-redevelopment audit gives your design team and planners a clear, evidenced view of what the existing building is worth keeping.

What is a pre-redevelopment audit?

A pre-redevelopment audit looks at an existing building at the very start of a project to test whether it can be retained, refurbished or adapted instead of demolished. It records the structure, fabric and key elements, and sets out the realistic options for each.

It comes before a pre-demolition audit. If demolition is still justified once retention has been tested, the pre-demolition audit then catalogues what comes out and where it goes.

  • Retention and adaptation options for each part of the building
  • Whole-life carbon inputs to compare retain and rebuild

Why you need a pre-redevelopment audit.

Planning authorities increasingly expect developers to show that keeping the existing building was properly considered before demolition was chosen. In London, referable schemes must submit a Circular Economy Statement under London Plan Policy SI 7, and the GLA guidance asks for a pre-redevelopment audit as part of it.

Doing it early is also cheaper. The embodied carbon in an existing frame is already spent, and a retention decision made at pre-application avoids design work on options that will not survive planning.

The Camio difference

Camio pre-redevelopment audits.

Our auditors capture the building on site with the Camio app, recording each element with photos, measurements, condition and embodied carbon. The results sit in a live inventory your whole team can review, rather than a static report.

If the scheme moves on to refurbishment or demolition, the same inventory carries straight into the next audit, so nothing is surveyed twice.

How it works

From site visit to finished report, in days not weeks.

  1. 01

    Capture on site

    Auditors record structure, fabric and key elements in the Camio app, with photos, measurements and condition.

  2. 02

    Carbon and options

    Embodied carbon is calculated for each element and retention, adaptation and reuse options are set out.

  3. 03

    Review together

    Your design team and planning consultants review the inventory online and agree what stays.

  4. 04

    Report in minutes

    The report is generated from the inventory, ready for your Circular Economy Statement, and can be re-run as the design develops.

  5. 05

    Carry it forward

    The inventory feeds your pre-demolition or pre-refurbishment audit, so the next stage starts with data already in place.

What's included in a Camio PRDA.

Deliverables

  • Retention options

    A clear view of what can be retained, adapted or reused, element by element.

  • Whole-life carbon inputs

    Embodied carbon data to compare retaining the building against rebuilding.

  • Planning-ready report

    Evidence formatted for your GLA Circular Economy Statement and pre-application discussions.

  • Live inventory

    An inventory that carries into later audits instead of being started again.

Compliance

  • GLA Circular Economy Statement guidance
  • London Plan Policy SI 7 (circular economy)
  • London Plan Policy D3 (circular economy principles in design)
  • Retrofit First policies, including Westminster

Ideal for

  • Developers at pre-application stage
  • GLA-referable schemes in London
  • Buildings where retention versus demolition is still open
  • Design teams preparing whole-life carbon assessments

Every asset, every life

Most audits describe a building on one day. Camio follows every asset for life.

Each item keeps its record through every life, every location and every owner. That is what makes Camio the natural fit for BREEAM In-Use, SKA and estates where assets move between projects again and again.

Asset record · Glass display counter

One item, followed across four stages

186 kgCO₂e kept in use across three lives
  1. Life 1

    Retail unit, Building A

    Owner: Tenant A

    2019 to 2026

  2. Audit

    Pre-refurbishment audit

    Captured, tagged, carbon calculated

    Oct 2026

  3. Life 2

    Floor 3, Building B

    Owner: Landlord

    2026 to 2029

  4. Life 3

    Resold to a new owner

    Via the Camio marketplace

    2029 onwards

Multiple lives

Reuse, refurbishment and resale are recorded against the same item, so carbon savings add up over every life.

Multiple locations

Moves between floors, buildings and projects are tracked, so the inventory always shows where things really are.

Multiple owners

Items keep their history when they change hands, from landlord to tenant to buyer, across your whole estate.

Audit enquiry

Tell us about your project.

We will come back with a scope and a fee proposal.

It helps to include

  • The site address and approximate floor area (GIA)
  • The audit you need, or the planning, BREEAM, GLA or SKA requirement it is for
  • Your programme: when you need the report and when strip-out or demolition starts
  • Drawings, asbestos surveys or previous audits, if you have them

[We aim to reply within X hours and can be on site within X days.]

FAQ

Questions we are often asked

What is the difference between a pre-redevelopment and a pre-demolition audit?

A pre-redevelopment audit comes first and tests whether the building should be kept or adapted. A pre-demolition audit comes later, once demolition is justified, and catalogues every material that will come out with a reuse or recycling route for each.

When should a pre-redevelopment audit happen?

As early as possible, ideally before or at pre-application, so the findings can shape the design and the planning strategy.

Do we need one for a GLA-referable scheme?

The GLA Circular Economy Statement guidance asks for a pre-redevelopment audit where existing buildings are on site. Your planning consultant will confirm what your scheme needs.